Go back to the homepage
Home Home     Contact us Contact us    Intercole Systems Intercole Systems Ltd
home

Brochure
Download Information
EMP Article
Brochure
Electronic Buyers Article page 1
Electronic Buyers Article page 2

 

 

 
Are you ready for Lead Free ?

Intercole's Lead Free Product Audit can give you a head start on conversion to lead free for existing products.

The use of lead (Pb) in electronic manufacturing will be banned in Europe from July 2006. Virtually all manufacturers of electronic components and assembly process materials will have to convert to lead free. Intercole can help you take your product through the transition to lead free.

Lead Free Product Audit

Converting your product to lead free does not mean simply throwing out the old solder. At the same time it does not necessarily mean redesigning the product. Inmany cases, you simply need to re-qualify the Bill of Material (BOM). Determining which component to order is, unfortunately, not standardized in terms of specifying whether they are lead free. Research is required on a component by component basis to determine whether it is available in lead free packaging, what the component Part number should be, and which manufacturers offer the component as lead free. Sometimes it is a matter of specifying a new part number for essentially the same part. In some cases, the part number remains unchanged. Many parts already have been converted, and most parts that are intended to be lead free are scheduled to be lead free by the end of 2005. If a manufacturer states that a part number is not scheduled to ever become lead free, it is a good indication that the part will be considered obsolete by 2006 or sooner.

Intercole offers a Lead Free Product Audit as a service to provide you with a review of your current products to determine what will be required to convert to lead free. The output of this exercise will be a revised BOM stating:-

a) Lead free part numbers and manufacturers

b) Specific ordering procedures if applicable when the part number is unchanged but the procurement process needs attention

c) A time table for anticipated lead free conversion where the manufacturer has not completed conversion yet

d) Recommendations where lead free is simply not available in a direct drop-in replacement.

As you will appreciate there is an attendant cost in undertaking the audit, but we believe the costs detailed below are competitive and can save time and bring significant added value to our customers organization in addressing the terms of the directive. 

To discuss your requirements or request a Quotation, please contact Intercole Sales on 02380 254727 or email to sales@intercole.co.uk

 
  Click for Examples
Site Last Updated: Copyright © Intercole Group 2007